The current position is : Home > Projects > Railway & Highway
Guangzhou-Shengzheng Railway
Guangzhou-Shengzheng Railway
The railway is a Class-I railway with 147km long in total. The branch-1 and branch-2 are two fast lines with the highest speed of 200km/h. Currently, the railway is only used for High-speed EMU.
China Bengbu International Technology & Economic Cooperation Ltd.
Headquarter Add:37th Floor, IFC, No. 18 Meishan Road, Shushan District, Hefei City, Anhui Province, P. R. China